R175 series: FD2.6 — 0.3/8 、 FD2.8 — 0.5/8 、 FD3.8 — 1/8
Wind-driven generator operation instructions
一
、
FD-300W , FD-500W , Model FD-1000W wind-driven generator , are changed
into the mechanical energy, changes into the electromechanical equipment
of the electric energy again by a kind of wind energy, utilize wind-power
electricity generation , is it is it deposit electric energy to hold to
charge to battery , can also change interchange power of 220V/50Z into
electric energy stored to hold, wind-power electricity generation does not need
fuel , pollution-free , have no noise. It terms kind to suitable
for wind energy generally, far away from electric wire netting , or electric
wire netting abnormal area, light supply, television, searchlight, put like,
communication apparatus and electric tool spend electricity.
二 Main technical parameter :
1、Pattern of the machine:The horizontal axle turns towards against the wind
2、Pattern of the blade :Screw type
3、Figure of the blade: 3 Slice
4、Wind wheel Diameter :2.6 m 、 2.8 m、 3.8 m
5、Amount Rotational speed : 400 Rotate / Divide
6、Amount Power :300W 、 500W 、 1000W
7、Working voltage :28V 、 42V 、 56V
8、Battery :24V 、 36V 、 48V
9、Start the wind speed :3.0 m / s
10、Design the wind speed : 8 m / s
11、Working range :3~ 20 m / s
12、Rotate the direction :Clockwise
13、Usage factor of wind energy :0.4
14、At a high speed than : 6 : 1~8 : 1
15、Adjust the speed way :Adjust and lean towards wind automatically
16、Set up a height : 5~7
三 The structure making up :
1、Generator 2、blade 3、The water conservancy diversion covering 4、Fin 5、The fin buffers and meets to adjust the bolt 6、Go back to turn 7、Have and set up the pole 8、Neutrality pole 9 Put and set up the pole、 10、Base 11、Electric case 12、Battery 13、Vertical scroll cap 14、Tip axle of the tail rod 15、Terminal box
四
1\The place choosing
The air blower should be installed in the place that enable wind to
fully utilize, and there is no tall and big barrier , make air blower
four face the wind, either place oneself in the hill bag , or although
the low-lying land in the place , but similar to the corridor, always
strong wind strength blows but richly endowed by nature .
a\If need to install the air blower near the barrier , is far away from
barriers as much as possible in conformity with the machine in a situation
that the condition is permitted, in order to utilize wind energy fully, one
that is from barrier distance require very much.
b. If erect air blower on barrier, installation of air blower should make
wind wheel go to reason higher than 2 meters of peaks of barrier at least highly
2.Install the rules
The installation of the air blower is a tense , careful , serious work, so
when install at the scene, must observe relevant safe operational procedures ,
and the work of erecting the air blower can only go on in a situation that the
wind speed does not exceed 8 meters per second ( moderate breeze )
After the foundation is hardenned, the handstand pole put , use the simple
and easy support about 1 meter high, whether support tip on setting up pole,
generator install the step as follows.
a.Dig one pit in ground, install good base flat to put hole , water the crushed
stone concrete.
b.Person who regards pit as centre 5.0 radius is it is it draw with 90 line
hole put into the hole ground anchor to dig one o'clock to divide equally,
water the concrete.
c.Set up by pole it last line,on set up by pole, made not setting up there
aren't pole, base. Draw line is it set up from sets of ring bottom pole one
circle is it lock with the clip to wear to wind upwards. Fasten the elasticity
thread device, play and rise to their feet the pole , the tight line adjusting
device , enable setting up the pole vertically.
As follows according to the step of putting
A , put washer , vertical scroll and is it turn suit daub the butter to go back
below vertical scroll.
B , is it turn sets of vertical scroll of entering to go back electrical machinery,
is it can't put inside out from head to foot to pay attention to (whether sign upwards),
lock card reed, put reason cap, cable thread wear out from the vertical scroll, export
the line to hand over with the electrical machinery. Handle the short circuit hidden
danger of the line well.
C , the cable thread exposed outside the machine , should wrap up sun-proof , wrap up
above the vertical scroll cap, is it is it make cable break the leather short circuit to
drop to prevent.
D , tail rod and tail rudder board join, look at tail board and parallel and unanimous
tail rod , screw M16 nut on, tail rod first end is it go back in turning to put into, axle of
the socket , screw M20 nut on.
E , assemble blade hub, blade concave surface face the wind, protruding in the face of the
electrical machinery, can't is it inside out , put kind blade is it put into electrical
machinery axle to become always , put washer to put, screw M20 nut on. Rotate the blade,
it is normal to check the axle of the electrical machinery , hub, the installation water
conservancy diversion is put on
F , electric getting red binding post and battery " ten " two circle very much of group
of case, getting dark binding post meet very much with " first ", and does not connect
it by mistake. Notice: The voltage of the battery and going against the becoming device ,
electric electromechanics to press identically, prevent breaking down, it is firm for post
to join very much, for prevent from battery post corrode very much , can spread a layer of oil .
G , air blower installation, check every place to connect errorlessly , draw the air blower. (see the Fig.) 五 Precautions : A , if find the electrical machinery and work abnormally, shake , or there are unusual sounds,
should shut down and check .
B , air blower tell when rotating, wind wheel rotate level direction , don't stand people and
carry on other work, in case the blade flies out of and hurts one's feeling.
C , the battery should keep dry and clean, the battery group don't put metal articles from
head to foot, prevent causing the short circuit of the battery.
D , the one that put up irons and matched only in electric case negative pole goes against the
becoming device and be put together, so as not to short out. Against turn into power use against turn into power manual operate it.
E , urgent line device of line meet after the strong wind will become flexible automaticallying,
can lock with the iron wire, whether after strong wind , the line becomes flexible to examine
Chala , get rid of if there are becoming flexible machines each time.
F , wind-driven generator should connect up alone, can't use with other circuit with , propose
that the illumination uses the direct current source , the household appliances can be used and
gone against the exchange power that the becoming device exported.
G , case when wiring , put through battery the generator outputs threads , resolve the generator
and export the line first and then disconnect battery group's wiring while resolving first.
H , electric shutting down switch of case, start the machine position usually, sufficient electricity
defend calamity better storm blow and use as shut-down temporarily in battery, wind ship is it dial reach
shut-down position to run slowly, does not allow to rotate and stir the switch in the high speed ed only.
The air blower must not run unloadedly , prevent rotating and damaging the blade at a high speed.
|